top of page

Our Work

This is your Project Page. It's a great opportunity to help visitors understand the context and background of your latest work. Double click on the text box to start editing your content and make sure to add all the relevant details you want to share.

IMG_9234.jpeg

Malabar gold 

All new ductwork was installed with two 5-ton heat pumps and a 300 CFM ERV.

Quesada tacos

All new ductwork with a Can-arm exhaust fan interlocked with Thermolec make-up air.

IMG_8645.HEIC
IMG_6275_edited.jpg

Samsung multizone heat pump

A professionally installed three-ton heat pump system with four indoor units was installed.

Mitsubishi heat pump

A professionally installed three heat pump system with four ceiling cassettes was installed.

IMG_9132.jpeg

Contact Us Now

  • Instagram
  • Facebook
  • LinkedIn

© 2025 by Centralhvacsol. Powered and secured by Wix

bottom of page